 | Drain pool |
 | Chip out entire pool as shown |
 | Cut below tile line and chip out |
 | Cut around main drain and return fittings |
 | Remove all debris |
 | Acid wash entire pool with straight muratic acid |
 | Rinse and clean entire pool |
 | Apply a special blend of white Portland, sand and a special bonding agent |
 | Apply at least 3/8 '' of the new plaster and trowel until smooth |
 | Start filling pool with water right away |